


Tanks are "framed" structures which are connected to the jacket in order to guarantee the required buoyancy during the jacket launching stage, as well as the subsequent self up-ending and floating phases ...
Structural analysis of the Castoro 6 pipeline lay vessel's external ramp lay for the as-built (damage d) geometry and for the strengthened geometric solutions at the regions of higher stress ...
The system is a Multibore Quick Connect / Disconnect Coupler, which provides a simultaneous connection of pressure lines (risers) while guaranteeing the "structural" connection between the FPSO and its mooring lines ...
Structural assessment of a Stinger for pipeline J-lay at different sea state loading conditions, utilizing finite element analysis and hydrodynamic analysis, in compliance with proper rules governing over the structural checks of offshore structures ....
easibility study of a system based on the principle of Multibore Quick Connect/Disconnect Coupler, that, besides the connections of pressure lines, guarantees the "structural" connection between LNG and loading arm ....
Structural integrity assessment of valve-body and of valve-to-pipeline interface sections. The only reliable way to establish proper confidence over the valve structural behavior was the performing of analysis by means of dedicated finite element model ....
Fluid-dynamics study and structural integrity assessment of shutoff valve body under impact load due to valve clap drop. The only reliable way to establish proper confidence over the valve structural behavior was the performing of analysis by means of dedicated finite element model ....
Study of structural behavior due to static loads in bend stiffeners .....
The project aims to determine the main parameters responsible by damage to duct bent cold .....
The primary objective of this project was to characterize the response of the Filler/control duct assembly when bent around a rigid tool .....
© All rights reserved | ESSS North America Inc.